Steel space grid gas station project construction

Este proxecto é un espazo cadrado / altura 16 metros / lonxitude total 30 metros / luz total 18 metros

1. A instalación do cadro espacial de aceiro debe realizarse despois da aceptación do eixe inferior da estrutura e do taboleiro incrustado.Os requisitos para o apoio inferior son: a diferenza de altura entre apoios adxacentes (distancia L2): o valor menor de L2/800 e 10 mm, á mesma cota Diferenza de altura entre o apoio máis alto e o máis baixo: 20 mm;

2. Determinar o proceso de instalación do cadro espacial de aceiro segundo a forza e as características estruturais da reixa e as condicións reais de construción no lugar;

3. Despois de instalar o cadro espacial de aceiro, debe comprobarse:

a.O valor permitido da desviación da lonxitude dos lados vertical e horizontal é 1/2000 da lonxitude e non debe ser superior a 30 mm;

b.O valor permitido da compensación do centro debe ser 1/3000 do tramo do cadro espacial de aceiro e non debe ser superior a 30 mm;

c.Para o marco de malla soportado pola periferia, a desviación de altura permitida é de 1/400 do soporte adxacente e non debe ser superior a 15 mm, e o máximo e o mínimo non deben ser superiores a 30 mm;para o marco de malla soportado por varios puntos, a desviación de altura permitida é de 1/800 do soporte adxacente e non debe ser superior a 30 mm;

d.Detectar a deflexión da reixa segundo as especificacións e requisitos de deseño.Despois da construción, a deflexión do cadro espacial de aceiro non será superior ao 115% do valor de cálculo do deseño.(Valor de deflexión máximo do cadro de cuadrícula L/250)

4. Se hai bolas de soldadura localmente, a soldadura por ranuras utilízase para soldar a bola de soldadura e a varilla, e o grao de soldadura non debe ser inferior ao segundo grao.

5. Despois de completar a instalación do cadro espacial de aceiro, a superficie das xuntas e varillas do cadro espacial debe estar limpa e libre de cicatrices e sucidade.As xuntas e o exceso de orificios das xuntas esféricas dos parafusos deben encherse e selar con graxa.

6. Durante o uso da rede, débese realizar un mantemento integral anticorrosión cada 4 ou 5 anos.

 

1. The installation of the grid frame must be carried out after the acceptance of the lower structure axis and the embedded board. The requirements for the lower support are: the height difference between adjacent supports (distance L2): the smaller value of L2/800 and 10mm, at the same elevation Height difference between the highest and lowest support: 20mm; 2. Determine the installation process of the grid according to the force and structural characteristics of the grid and the actual construction conditions on site; 3. After the grid frame is installed, it should be checked: a. The allowable value of the vertical and horizontal side length deviation is 1/2000 of the length, and should not be greater than 30mm; b. The allowable value of center offset should be 1/3000 of the span of the grid, and should not be greater than 30mm; c. For the mesh frame supported by the periphery, the allowable height deviation is 1/400 of the adjacent support, and should not be greater than 15mm, and the maximum and minimum should not be greater than 30mm; for the mesh frame supported by multiple points, the allowable height deviation is 1/800 of the adjacent support, and should not be greater than 30mm; d. Detect the deflection of the grid according to the specifications and design requirements. After construction, the deflection of the grid frame shall not be greater than 115% of the design calculation value. (Maximum deflection value of grid frame L/250) 4. If there are welding balls locally, groove welding is used for welding the welding ball and the rod, and the welding seam grade should not be lower than the second grade. 5. After the installation of the grid frame is completed, the surface of the joints and rods should be clean and free of scars and dirt. The joints and excess holes of the bolt ball joints should be filled and sealed with grease. 6. During the use of the grid, comprehensive anti-corrosion maintenance should be carried out every 4 to 5 years.
1. The installation of the grid frame must be carried out after the acceptance of the lower structure axis and the embedded board. The requirements for the lower support are: the height difference between adjacent supports (distance L2): the smaller value of L2/800 and 10mm, at the same elevation Height difference between the highest and lowest support: 20mm; 2. Determine the installation process of the grid according to the force and structural characteristics of the grid and the actual construction conditions on site; 3. After the grid frame is installed, it should be checked: a. The allowable value of the vertical and horizontal side length deviation is 1/2000 of the length, and should not be greater than 30mm; b. The allowable value of center offset should be 1/3000 of the span of the grid, and should not be greater than 30mm; c. For the mesh frame supported by the periphery, the allowable height deviation is 1/400 of the adjacent support, and should not be greater than 15mm, and the maximum and minimum should not be greater than 30mm; for the mesh frame supported by multiple points, the allowable height deviation is 1/800 of the adjacent support, and should not be greater than 30mm; d. Detect the deflection of the grid according to the specifications and design requirements. After construction, the deflection of the grid frame shall not be greater than 115% of the design calculation value. (Maximum deflection value of grid frame L/250) 4. If there are welding balls locally, groove welding is used for welding the welding ball and the rod, and the welding seam grade should not be lower than the second grade. 5. After the installation of the grid frame is completed, the surface of the joints and rods should be clean and free of scars and dirt. The joints and excess holes of the bolt ball joints should be filled and sealed with grease. 6. During the use of the grid, comprehensive anti-corrosion maintenance should be carried out every 4 to 5 years.
1. The installation of the grid frame must be carried out after the acceptance of the lower structure axis and the embedded board. The requirements for the lower support are: the height difference between adjacent supports (distance L2): the smaller value of L2/800 and 10mm, at the same elevation Height difference between the highest and lowest support: 20mm; 2. Determine the installation process of the grid according to the force and structural characteristics of the grid and the actual construction conditions on site; 3. After the grid frame is installed, it should be checked: a. The allowable value of the vertical and horizontal side length deviation is 1/2000 of the length, and should not be greater than 30mm; b. The allowable value of center offset should be 1/3000 of the span of the grid, and should not be greater than 30mm; c. For the mesh frame supported by the periphery, the allowable height deviation is 1/400 of the adjacent support, and should not be greater than 15mm, and the maximum and minimum should not be greater than 30mm; for the mesh frame supported by multiple points, the allowable height deviation is 1/800 of the adjacent support, and should not be greater than 30mm; d. Detect the deflection of the grid according to the specifications and design requirements. After construction, the deflection of the grid frame shall not be greater than 115% of the design calculation value. (Maximum deflection value of grid frame L/250) 4. If there are welding balls locally, groove welding is used for welding the welding ball and the rod, and the welding seam grade should not be lower than the second grade. 5. After the installation of the grid frame is completed, the surface of the joints and rods should be clean and free of scars and dirt. The joints and excess holes of the bolt ball joints should be filled and sealed with grease. 6. During the use of the grid, comprehensive anti-corrosion maintenance should be carried out every 4 to 5 years.